Core drilling · Commercial · Skanska
300mm Cores Through Reinforced Concrete for IKEA
- The job
- A run of 300mm cores through heavily reinforced concrete walls for new services, on a live Skanska site for IKEA.
- What we did
- Scanned and marked every position, confirmed with the principal contractor that cutting bars was approved, then cored wet with a rig-mounted drill and slurry collection, easing off through the rebar.
- The result
- Every core cut clean in its marked position, at 30–45 minutes per core through the heaviest steel, with no slurry left on site and no hold-up to the services install.